Client: Dura Vermeer Group N.V.
Period: 04/2016 – 10/2016
Description: Concept and final design and construction drawings for the construction of the Airside and Landside of Lelystad Airport.
Services provided:
Preparation of the comprehensive final design document for the construction of Lelystad Airport, including all civil and electrical components.